On paper, my dependency pipeline has four robots and one human, and the human’s job is to press one button.
Dependabot opens upgrade pull requests. Each repo’s CI says whether they build. git-steer plans which ones to merge, waits for my approval, and merges them at a safe pace. GitHub Copilot picks up anything that needs real code. Cloudflare deploys what lands. I add an approved label from my phone and go do something else.
Last week the fleet (22 repos across a few GitHub orgs) had 198 open Dependabot PRs and about 1,700 open security alerts. The first time I asked git-steer to fix the fleet, it found 8 PRs it was willing to merge.
Today it found 150, closing 509 alerts, and they’re merging as I write this. Getting from 8 to 150 took one long day. Almost none of that day was spent on merging, which is the interesting part.
How it’s supposed to work
The design lives in two decision records in the git-steer repo: ADR-010 (rollouts) and ADR-011 (requests).
- I open an issue titled
fix fleetin a private control repo. - git-steer’s read-only App reads every repo, every Dependabot PR and its checks, and replies with a plan: ready (a real build or test passed), untested (nothing ran), failing, or held (a major version).
- It opens a rollout issue listing every PR it may merge. Nothing happens until I add
approved. - Each step merges at most 5 PRs an hour, one per job, with a token scoped to one repo. It re-checks every PR right before merging.
- Code work goes to Copilot through hand-off issues.
The rules that matter: a failing build or test always blocks, and a passing scanner is not a test. CodeQL going green tells you nothing about whether the upgrade compiles.
What actually happened
Those rules held all day. Nothing merged without a real check passing, and the approval gate never got bypassed. But the pipeline only moved because I kept stepping into the gaps between the robots. Here’s where each one fell short.
Repo CI: the real bottleneck
I went in thinking merging was the slow part. It wasn’t even close.
Builds that never ran on pull requests. Several repos had a perfectly good build workflow that triggered only on pushes to main:
on:
push:
branches: [main]
workflow_dispatch:
Dependabot’s PRs got no check at all, so git-steer correctly held them as untested. That one shape accounted for 52 PRs in seven repos. The fix is boring: add pull_request:, and on PRs build the container image without logging in or pushing it.
- name: Log in to GHCR
if: github.event_name != 'pull_request'
# ...
- name: Build and push
with:
# Pull requests build the image to test it; only main pushes it.
push: ${{ github.event_name != 'pull_request' }}
Security gates that block their own fixes. One repo’s PR check ran:
npm audit --audit-level=high || exit 1
The default branch had 40 high or critical advisories, so that line failed every pull request. That included the Dependabot PRs whose whole purpose was removing those advisories. It’s a deadlock: the fix can’t merge because the problem it fixes still exists.
A PR gate should ask “does this PR make things worse?”, not “is everything perfect?”. So now it audits both lockfiles and compares:
head=$(npm audit --package-lock-only --json | count_high_and_critical)
git show "$BASE_SHA:package-lock.json" > /tmp/base/package-lock.json
base=$(cd /tmp/base && npm audit --package-lock-only --json | count_high_and_critical)
[ "$head" -gt "$base" ] && exit 1 # only fail on new advisories
The first PR through it reported base 40, this PR 39 and passed. All 28 of that repo’s Dependabot PRs went from blocked to mergeable.
Time bombs. A test seeded a “future” campaign date of July 25, 2026. That worked fine until July 25, 2026. Nobody noticed, because the test never ran on PRs (see above). The fix is to pin the clock, not to bump the date:
vi.useFakeTimers({ toFake: ['Date'] });
vi.setSystemTime(new Date('2026-07-10T00:00:00.000Z'));
The good news. Once smoke tests ran on PRs, they started catching real breakage before it merged. SQLAlchemy 2.1 quietly maps postgresql:// to the psycopg 3 driver; the app ships psycopg2, so it wouldn’t even import. pdfjs-dist 6 moved destroy() from the document to its loading task. A framework major bump rejected an HTML comment as the first child of a JSX expression. Every one of those would have merged on a repo with no CI.
Dependabot: tireless and a little careless
- It keeps pace with you. There were 176 open PRs in the morning and 177 in the afternoon, after ten had merged.
- Old PRs don’t get new CI. A PR opened before the repo had a PR check has no check until it’s rebased. I sent about 120
@dependabot rebasecomments today. It processes them in batches over 10 to 30 minutes. - Groups mix risk. A “minor and patch” group that also carries Tailwind CSS 3 → 4 fails as a unit, and every safe patch in it waits.
- It’s occasionally just wrong. It proposed container tag
1.19.1for an image that only publishesv1.19.1. It bumped a requirement range straight past a cap I’d set on purpose, because the next major breaks the server. - Touching its branch has a cost. Once you push a fix onto a Dependabot branch, it stops rebasing that PR. It’s yours now.
git-steer: correct, slow, and missing hands
- The pacing is fleet-wide. Five writes an hour made sense for settings changes. For 150 merges it means about 30 hours, and one rollout’s merges starved the next one’s budget.
- Every round is manual. I filed
fix fleetthree times today, and each new rollout had to supersede the last by hand. - The schedule isn’t a schedule. GitHub skipped an hour of the cron. It also dropped
pull_requestevents twice, so CI never ran on a PR until I dispatched it by hand. - One blind spot became a bug. git-steer ignores a scanner that also fails on the default branch; that’s the only way vulnerability gates and Dependabot can coexist. It read the base from the newest commit that ran any checks. Then a release tool pushed
chore(release): 1.0.0 [skip ci], which ran only CodeQL, and the scanners one commit below disappeared. Now each check is judged on the newest commit that actually ran it. - It has no hands for the small stuff. It can’t ask Dependabot to rebase, can’t close a superseded PR, and can’t push a one-line fix. So I did all of that from my laptop.
That last point is the uncomfortable one. git-steer’s founding rule is that git-steer does the writes, through approved, budgeted, recorded rollouts. Today every rebase request, branch fix and cleanup came from my laptop, and none of it went through the approval gate. It was fast and it was all correct, but it’s exactly the shortcut the design exists to prevent.
Copilot: the right tool for a different day
Copilot did none of today’s code work. The work wasn’t too hard; the hand-off was too slow for a day spent at the keyboard:
- Workflow runs on Copilot’s PRs are held until a person releases them.
- Its PRs open as drafts.
- A round trip takes 30 to 45 minutes.
- It can’t touch anything that needs secrets, a cluster, or three repos at once.
Copilot shines on unattended migrations: hand it a failing framework upgrade before bed and review the PR in the morning. When I’m already in the terminal with the failure in front of me, it’s faster to fix it myself.
Cloudflare: deploys are their own pipeline
-
Dependabot PRs get no Actions secrets. The deploy step has to skip on pull requests, leaving the build as the check.
-
The action I used was retired.
cloudflare/pages-actionis gone;cloudflare/wrangler-actionreplaces it. -
The project has to exist first. A Pages project must exist before the first deploy. I added a pre-step to create it, and the first deploy failed anyway, because wrangler-action runs each
preCommandsline on its own:# broken: two lines, two shells, "end of file unexpected" preCommands: | npx wrangler pages project list | grep -qw my-site || npx wrangler pages project create my-site --production-branch=main # works: one line, and npx needs --yes on a runner preCommands: | npx --yes wrangler pages project list | grep -qw my-site || npx --yes wrangler pages project create my-site --production-branch=main -
Wrangler pulls its dependencies along. Wrangler 4 declares a peer on
@cloudflare/workers-types5, so the wrangler bump alone failednpm ciwithERESOLVE. -
Main-only deploys skip the eyeballs. Four sites took Tailwind CSS 3 → 4 today. The official upgrade tool renames utilities so the output looks the same (
shadow-sm→shadow-xs,bg-gradient-to-r→bg-linear-to-r), and every build passed. But a passing build can’t tell you whether a page looks right, and those changes went live without anyone seeing them first.
For the deploy token I skipped the wizard. In the logged-in dashboard, I created a token that can only edit Pages on one account and piped it straight into gh secret set, so it never hit a screen or a log.
The plan
The numbers tell the story. Before the CI work, git-steer could merge 8 PRs. After it, 150. The code changes were a few lines each. The time went into missing CI and coordination, not merging.
So the plan, written up as ADR-012, goes in that order:
- A CI baseline in the fix plan. For every repo, git-steer reports whether a build or test runs on PRs, whether each scanner runs on both PRs and
main, and whether security gates compare with the base. A repo that misses it shows up as needs CI, with the reason, instead of as a pile of “untested” PRs. That alone would have pointed straight at 52 of today’s PRs. - Give git-steer the missing hands. “Ask Dependabot to rebase” and “close a superseded PR” become rollout changes: approved, budgeted and recorded like a merge. Then nothing on today’s laptop list needs a laptop.
- A standing fix request. Approve once; git-steer re-plans every step, picks up new passing PRs and carries leftovers forward. No more rounds.
- Pace per repo, not per fleet. At most one write per repo per step. Writes in different repos don’t conflict, so 30 hours becomes a few.
- A Dependabot policy. Majors never share a group with patches, deliberate caps are
ignorerules, and a short cooldown stops the rollout chasing releases that are hours old. - Copilot for unattended migrations, with its held workflow runs released automatically.
- Previews before visual changes go live. Non-Dependabot PRs on static sites get a preview deploy.
- Make shortcuts visible. The fleet report lists any merge, close or push on a managed repo that git-steer didn’t make. If I take the laptop shortcut again, it shows up in the report.
Each one is its own issue on git-steer, and the first is underway.
What I’d tell you to check today
You don’t need git-steer to take something from this. If you use Dependabot, look at three things in each repo:
- Does anything build or test on
pull_request? If not, every Dependabot PR is a coin flip, and auto-merge will happily merge it. - Does any security gate fail on an absolute count? If it does, it’s blocking the PRs that would fix it. Make it compare against the base.
- Do your majors share a group with your patches? Split them, so one breaking upgrade doesn’t hold up ten safe ones.
Robots are great at doing a step. What breaks is the hand-off from one robot to the next, and that’s where I spent my day.